Cloud & Infrastructure

Cloud Migration

Plan and carry out moves from on-premises or between clouds, workload by workload, with dependency mapping, rehearsed cutovers and tested rollback.

  • Discovery and dependency mapping

    An inventory of servers, applications, data stores and the connections between them.

  • Strategy per workload

    A clear choice for each system: rehost, replatform, refactor, replace or retire.

  • Wave planning

    Workloads grouped by dependency and risk, starting with lower-risk systems.

  • Data migration

    Database and file transfers with replication where needed to keep downtime short.

  • Rehearsed cutovers

    Each cutover practiced in advance, with a checklist, validation tests and a rollback point.

  • Post-migration optimization

    Right-sizing, managed service adoption and cost review after workloads settle.

What it is

Cloud migration moves applications, data and infrastructure from an on-premises data center, a hosting provider or another cloud into a target cloud environment. A good migration is less about copying servers and more about understanding dependencies, choosing the right strategy for each workload and switching over without disrupting the business.

When you need it

  • A data center lease, hardware refresh or hosting contract is coming to an end.
  • Infrastructure is hard to scale, patch or recover after failures.
  • You want to adopt managed services and automated deployments.
  • You are consolidating environments after a reorganization or acquisition.

How we approach it

Migration starts with discovery. We inventory servers, applications, databases, scheduled jobs and file shares, and we map the dependencies between them, including the undocumented ones found in network traffic and configuration files. Missing a dependency is the most common cause of a failed cutover.

For each workload we pick a strategy. Rehosting moves it largely as is. Replatforming swaps components for managed services, such as a managed database. Refactoring redesigns the application for the cloud. Some systems are better replaced by a SaaS product or simply retired.

The target environment, including networking, identity, security guardrails and monitoring, is built first and defined in infrastructure as code. Workloads then move in waves, grouped so that tightly connected systems move together. Each wave has a runbook, a rehearsal in a non-production setting, validation tests and a rollback point. Data is replicated ahead of time where possible, so the final switch only transfers recent changes.

After each wave, we monitor performance, tune sizing and confirm costs. Source systems are switched off only after an agreed stabilization period and data archiving.

Common pitfalls to avoid

  • Incomplete discovery. A forgotten batch job or hard-coded IP address can break a whole wave.
  • Changing everything at once. Combining migration with major redesign multiplies risk.
  • Skipping rehearsals. Cutovers that have never been practiced take longer and fail more often.
  • Copying old sizing. On-premises servers are often oversized. Size from measured usage.
  • Leaving source systems running indefinitely. Paying for both environments erodes the benefits.

Frequently asked questions

How long does a cloud migration take?

It depends on the number of workloads, their dependencies, data volumes and how much change happens along the way. Wave planning lets the first systems move early while the rest follow in stages.

How much downtime should we expect?

It varies by system. Replicating data ahead of the cutover keeps the final switch short, and we schedule cutovers in agreed maintenance windows.

Should we modernize applications during the migration?

Only where the benefit is clear. Changing too much at once raises risk, so many teams rehost first and modernize afterward.

What if something goes wrong at cutover?

Each cutover has validation checks and a defined rollback point. If checks fail, traffic returns to the source system while the issue is fixed.